All work
Rail
Forty-year-old bogie parts, made new again.
Fleet kept running, no redesign
Client
Ridings Rail Depot
Material
S355 steel
Process
Reverse engineering, milling, fixtures
Quantity
120 brackets
Tolerance
±0.02 mm
Lead time
8 weeks

01 · The challenge
A depot needed replacement bogie brackets for a fleet built in the 1980s. The original drawings were lost and the maker no longer existed.
02 · Our approach
We measured worn parts, drew new models, had them approved and built a fixture so every bracket would match.
03 · The result
120 brackets were delivered and fitted without modification. The drawings and fixture are kept for the next order.



“They brought a forty-year-old part back to life.”
Fleet Engineer, Ridings Rail
§ Request a quote
Have a drawing? We’ll price it in 48 hours.
Quote turnaround · 48 h