§ Work
Results we can put a number on.
Seven case studies · six industries
A few jobs we are allowed to talk about. Each one starts with a drawing and ends with a measured, documented part.

Aerospace
Northvale Aero
Zero escapes in 3 years

Medical Devices
Kestrel Medical
Prototype to theatre in 9 days

Energy
Calder Energy
12% longer bearing life

Motorsport
Brackley Racing Club
Part on the car in 5 days

Food & Packaging Machinery
Penrose Packaging Systems
Three suppliers replaced by one

Rail
Ridings Rail Depot
Fleet kept running, no redesign

Energy
Harrow Hydraulics
Line-side scrap down 40%
§ Request a quote
Have a drawing? We’ll price it in 48 hours.
Quote turnaround · 48 h